<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/">
  <channel>
    <title>India Travel News tagged mumbai-international-airport-private-limited, Latest Travel News, Travel Breaking News</title>
    <link>http://www.mustseeindia.com/news/tag/mumbai-international-airport-private-limited</link>
    <description>Read latest  India travel and tourism news, travel breaking news, travel tips, travel news around India, destnation information, travel advice and many more.</description>
    <item>
      <title>Mumbai International Airport's Main Runway to Be Closed For Four Months</title>
      <link>http://www.mustseeindia.com/news/mumbai-international-airport-s-main-runway-to-be-closed-for-four-months/2581</link>
      <description>&lt;font size=&quot;2&quot; face=&quot;arial&quot;&gt;&lt;img src=&quot;http://img855.imageshack.us/img855/3677/89239862.jpg&quot; width=&quot;500&quot;&gt;&lt;br&gt;&lt;/font&gt;&lt;div&gt;&lt;font size=&quot;2&quot; face=&quot;arial&quot;&gt;&lt;br&gt;&lt;/font&gt;&lt;/div&gt;&lt;div&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0in;margin-bottom:.0001pt;text-align:
justify;mso-line-height-alt:10.85pt;background:white&quot;&gt;&lt;span style=&quot;color:black&quot;&gt;&lt;font size=&quot;2&quot; face=&quot;arial&quot;&gt;Owing
to the construction of the RET at MIAL, flyers at Mumbai airport may have to
face delays for the next 4 months. Although inconvenience is expected to be
caused due to the closure of the main runway, many positive changes can be seen
in matters of flight operations in the future. A MIAL spokesperson said that the
RET work will be over by June 1. During this mentioned time period, flights will
be operated on the secondary runway (14-32), but the airport officials also
mentioned that people should be prepared to face delays of 30-40 as the
secondary runway cannot fit as many flights as the main runway. During peak
departure hours in the morning and peak arrival hours at night, the runway will
be open for operations, and movement of flights during the day will be carried
on the secondary runway.&amp;nbsp;&lt;o:p&gt;&lt;/o:p&gt;&lt;/font&gt;&lt;/span&gt;&lt;/p&gt;

&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0in;margin-bottom:.0001pt;text-align:
justify;mso-line-height-alt:10.85pt;background:white&quot;&gt;&lt;span style=&quot;color:black&quot;&gt;&lt;o:p&gt;&lt;font size=&quot;2&quot; face=&quot;arial&quot;&gt;&amp;nbsp;&lt;/font&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;

&lt;span style=&quot;line-height: 115%; color: black; &quot;&gt;&lt;font size=&quot;2&quot; face=&quot;arial&quot;&gt;The need for more RETs was felt so that more flights can be accommodated
by reducing the aircraft runway occupancy time. As of now, the airport has four
RETs and five parallel exit taxiways. As stated by a senior airport official,
&#8220;RET will help the ATC manage more number of flights per hour and the
construction is part of MIAL&#8217;s plan to create a network of parallel taxiways
and RETs along the two runways. The construction of the entire network will
take place in several phases,&#8217;&#8217; he added. Although the secondary runway will compensate
till the time the main runway is shut, unfortunately, it is not well equipped
to manage the same number of flights as the main runway. Worse could be
expected if the visibility level drops due to smog. In this case, the main
runway will have to be made available for flight operations.&lt;/font&gt;&lt;/span&gt;&lt;br&gt;&lt;/div&gt;</description>
      <guid>2581</guid>
      <pubDate>Wed, 18 Jan 2012 15:04:28 +0530</pubDate>
    </item>
  </channel>
</rss>
